How do I apply for a new connection?

A newly built property is likely to require two connections - a new water connection and a new sewerage connection.

There are five steps in applying for a new connection:

  • complete the application form
  • obtain water regulations approval
  • have your trench and service pipe inspected
  • make payment
  • arrange the connection.

Find out more and apply online.

Powered by Synthetix